Case Studies


Client
Job Description

Location

Duration

Raynesway Sir Chris Hoy Veledrome, National Indoor Sports Arena . (More info) Glasgow 2 Months
Cemex Cowieslinn Quarry, Overburden Stripping &Tip Construction. Near Peebles 6 Weeks
Cemex Bonnington Mains Quarry, Overburden Stripping &Tip Construction. Newbridge 6 Weeks
Hunts Contractors Glenturner Distillery, Soil stripping and reduction to formation level & Tip construction. Livingston 4 Weeks

Black & Veatch

Excavation and formation works to enable water treatment buildings to be constructed below original ground level. Muck hauled to on site tips as well as hauling to our off site SEPA licensed tip. Supply and laying of Geotextiles and gravel to provide horizontal and vertical drainage around the structures. Compaction of suitable clays around the structures as well as placing topsoil on the roof of the structures with low ground pressure machines.
Glencorse, Penicuik 2.5 Years
Sir Alfred McAlpine Topsoil stripping, excavation of trench for laying of Gas Pipeline, backfilling and reinstatement of soils. All over UK 2 Years
Norwest – Socea Topsoil stripping, excavation of trench for laying of Gas Pipeline, backfilling and reinstatement of soils. All over UK 6 Years
Stewart Milne Homes Enabling works contract - preparation of ground (mostly peat) for house building and road network East Kilbride 6 Months
Onyx, Amec, Crouch and Miller Mining companies Stripping of soils in advance of coaling operations, land reclamation of former opencast, restoring former works with soils from advance cuts or from previously erected storage dumps. Sites across Scotland 7 years / seasonal works
Edmund Nuttall Ltd
  1. Formation of secure containment facility
  2. Removal of contaminated land
  3. Encapsulation of 4m tonnes of contaminated material
  4. Slagbed restoration, concrete remediation
  5. Overall landscaping of the site, for future use.
Ravenscraig, Motherwell 3 Years
Scottish Resources  Group Soil Stripping of new operational areas and land reclamation on former opencast coal sites Sites across Scotland Ongoing / seasonal works
Mowlem Scotland Ltd
Earthworks for construction of Livingston Football Stadium, car park and road network
Livingston 8 Months
Mowlem Scotland Ltd Enabling works contract - Earthworks to provide formation level to allow construction of the Kingsgate Retail Park East Kilbride 6 Months
Mowlem Scotland Ltd Earthworks to provide formation level to allow construction of the M8 J4 distribution park. Construction of SUDS ponds and environmental control measures M8 Junction 4 6 Months
Morrison Construction Earthworks (large quantity of hard rock) to provide road formation level to allow construction of the A921 Hillend bypass A921 Hillend 10 Months
RJ McLeod Ltd Greenloaning improvements - 6.6km dual carriageway, finished ahead of schedule A9 Blackford 18 Months
RJ McLeod Ltd Shinty Pitch – blasting and excavation of rock to pitch formation level. Oban 8 Months
Harbour & General River Kelvin flood prevention – formation of clay embankments and ancillary works, including muck on and off site. River Kelvin 3 Months
Harte Construction Enabling package at various projects, including constructing road formation, attenuation ponds, breaking and crushing of concrete, regrading site Sites across Scotland 12 Months
Aggregate Industries Duntilland Quarry, strip soils and overburden to expose product rock Duntilland Over 6 Years
Mansell Limited Cut and fill and form football and Hockey pitches. Dunoon Grammar

4 Months